Start/stop is used to start and stop automatic recording of time spent on a project.
Start/stop works in both Project draft and Time registration
Start/stop can be used in the following locations
Start/stop can be started in two places in the standard accounting.
In other accounts and if Time is turned off, Start/Stop can only be accessed in the "Top menu"
To start Start/Stop, press [Add] in the screen below
Now enter the required information. Missing information can be entered later.
Or it can be edited via "Edit all"
If Project and Time are enabled, start/stop times are registered in the Time draft
If only Project is enabled, start/stop times are registered in the Project draft.
This shows the result of Start/Stop in the Timecladder.
A Project Draft must always be created for each employee, regardless of what is enabled.
Start/Stop automatically rounds the entry up/down based on the setup in Uniconta. Read more here.
- Uniconta assistant. Read more here.
- Uniconta Windows client