Project Budget
This shows budgets on all projects.
It can be seen whether the individual budget is active. Likewise, Records and sums can be displayed.
In addition, prices can be updated on existing Budgets.

Project: Budget lines
On the budget lines, you can use item numbers, employees, salary types, and dimensions. At the same time, there is an overview of gross margin and gross margin for the line itself and for the entire budget.
If bills of materials have been used in the budget, they can be unfolded for use in master planning. Read more
here.

Version-91 Add Period. Here, filtered entries can add "Days, months, or years" to Date.
Estimation
Read about estimation
here.
Product disposition
Read more
here.
Controllers
Read more about it
here
Set current budget group
The feature sets all budgets in the budget group that is selected as the current budget group. This will show figures for the budgets concerned in all statistics. In planning and calendar planning as well as in the report project balances / Art, "Current" project budget is always used.
Lock anchor budget
When the budget is finished, it can be saved as Anchor Budget. It is then possible to compare with e.g. realized figures, Subsequently edited budget figures and Standard times.
The anchor budget is saved and cannot be edited from the planning and budget modules.

Lock Anchor Budget
Here, a copy of the budget is taken, which is then saved with a new "Budget header". An anchor budget can then be used, for example, as a comparison in
planning and to form an
invoice proposal in Project that is similar to the original estimate.
Copy pre-calculation
Version-91 Read about Copy estimation
here.
Import budget from Excel
It is possible to import your project budget to Uniconta, via
Tools/Data/Load data
The following is an example of which fields you can use.
Note: The "Current" field on the budget must be checked in order to import the budget lines.
Budget fields: (table: ProjectBudgetClient)
Note: The Budget field does not need to be imported, but is created when importing the remaining fields.
At a minimum, you must import Project and Budget Group. Budget group must be created before import.
Budget (the key) |
The project |
Budget group |
Commentary |
Created |
Current |
NB! Before version 92, the key field was called PrimaryKeyId. After version 92, it is called Budget.
Budget lines: (table: ProjectBudgetLineClient)
In order to import the budget lines, you must have Budget associated in your import file. Budget is the "key" assigned to the budget project and must be linked to the lines.
This "key", the
Budget field, does not appear in a standard layout and must be retrieved from
Layout/Editor. Once you have inserted the Budget field in the overview, select everything (Ctrl+A) and copy all lines (Ctrl+C) to Excel (Ctrl+V), from where you can link Budget to your budget lines based on the projects they belong to. You can do this in Excel, possibly by creating a V lookup.
Note: Budget and Unique ID have the same function and therefore the fields must be filled with the same values.
Budget / Unique ID |
The project |
Date |
Cost price |
Type |
Number of |
Explanation of why we need the 'Budget' field
In the project budget, the project number is not enough, as we can have multiple budgets on the same project, ex. one per year.
So the relation between budget and lines is Budget (1 to many)